Song Phuong JSC

call us: 043 715 15 31

Grand Building

grand-building

The GRAND building is situated in strategic location in the centre of Hanoi, about 01 km from Hoan Kiem lake and walk-able to Sunway Hotel & Ruby Plaza Centre. It is office building with international standard to achieve the conditions as the following.

BASIC CONDITIONS DESCRIPTION
Floor Area 11- storey office building is included 01 basement for parking area and 01 lift. The floor areas are from 100 sqm to 150 sqm
Fitting out period The handover date is expected on the beginning of July 2008. The Tenant will enjoy 01 free-rental month for fitting-out. Electricity and
water usage shall be paid by client as actual usage during fitting out period
Standard equipments by the Landlord The Landlord supplies the foundation of house, plaster ceiling,
sprinkler, light system, Fujitsu individual air-conditional system, white painted wall, glass window system, available telephone and internet sockets, VNPT & FPT Internet suppliers, electric sockets & Clipsal switches on the walls.
Tenant works The Tenant can send their contractors to do the fitting-out allowed by the Landlord’s security, décor must be sent to be approved by Landlord first. Installation is not influent to building ‘s structures.
Parking 01 Parking Area
Elevator 950 kg high speed elevator (Mitsubishi)
Services and Management - Cleaning to all common areas
- 24 hr trained security of the building
- Receptionist and Technical Management of the building
- Free charge of water in common areas
Emergency system - Modernization fire prevention
- Emergency elevator and corridor.
- Electricity power back up
Rental Price 27USD/sqm for 1/F
25USD/m2 for other floors
This rental is inclusive of service charge – exclusive of VAT and
electricity fee (lighting system, air conditioners and switches) consumed by the Tenant on the leased premises.
Period of Lease 03 – 05 years
Payment Every 06 months within the first seven days of the rental payment period.
Security Deposit Security deposit of 01 month rental within the first seven days from the offer letter is signed.